Sök:

Sökresultat:

2820 Uppsatser om Production drawing - Sida 1 av 188

Uppskärningsmaskin : Underlag till CE-märkning

Abstract (in English)The work that lead to a CE- marking and the creation of a total drawing foundation on an existing machine carried out on the company Polytec Composites Sweden AB in Ljungby. The company have design an machine that exist in six example that runs in the production. To be able to use the machine the company have to work out a CE-marking. The process that summed up all the document that needs for the machine to make a CE-marking. The documentation includes a total drawing over the machine and a risk analysis performed by a group employers on the company.

Val av värme- och ytbehandling

Atlas Copco Tools develops and manufactures handheld industrial tools. Heat and surface treatments are used to provide the tools with certain properties. There are no routines for the choice of treatment or for how to specify treatment on drawings. Production documents that are sent for production abroad may not be clear enough. Some treatments are known as trademarks and there are no instructions for how to specify these on drawings and in CAD-models.The purpose of this master thesis work is to create recommendations for the procedure of choosing heat and surface treatment.

Sammanställning och produktion av ritningsunderlag till båt

Hanterbara båtar is a new company who builds alumina boats customized for people in wheelchairs. Due to the fact that the company only built two boats yet, the production documentation is not complete. The drawing that does exist is not in an exact standard which makes production planning harder.The purpose of this work has been to make the production of the boat easier and simplify further development and modification. Product development in the form of optimizing details is also one of the main purpose of this work.This is all done by making a 3D-assembly of all the existing drawings. After this is done new drawings will be made and added to the main assembly.

Produktionsutveckling av bastuaggregatsavdelning

To invent an optimized product is a complicated process. This process is only half of the work. It is equally important to develop a production system that can produce the product in an  efficient and ergonomic way.After several evaluations of conceptual and detailed drawings a final idea has come to light.The idea intends, to the maximum extent, utilize the facility in a more efficient way through moving assembly lines and stations closer to the flock section and the stock for complete products. To make the production better, stations are placed in more logical places given the assignment they are supposed to accomplish. This improves the material flow radically.

Projektering av fårstall :

The purpose of this work was to see if it was possible to rebuild an old dairy house into a house fore sheep production. The goals fore the work was to see witch kind of production model was suitable, how the actual drawing would look like and witch kind of interior was needed. The building was built in the beginning of 1900. It is located on the mountain Kinnekulle in Sweden. It was a big production fore its time and hade about 60 dairy cows. It was a lot of hard work because the floor was built by big stone blocks and it was very hard to rebuild when some more automatic solutions came fore handling all the manure. The idea of remaking the building came when we rebuilt the roof fore 5 years ago.

Avvägning mellan ordersärkostnad och lagerhållningskostnad i processindustrin

Lean Production is used by many manufacturing companies. Companies in process industries do not use Lean Production to the same extent today. This is part of the report's issue to explore how Lean Production can be applied to a company in the process industries.The investigated company is a processing company that manufactures various types of foil. The company wishes to streamline its production and has therefore asked the authors to examine if Lean Production can offer the company improvements in their production. Lean Production value stream mapping tool has been selected to identify and analyze the current state of two of its products in production.

Toleransproblem vid produktion och montering av prefabricerade betongelement

The idea with constructions made out of prefabricated elements is that it should be quick and easy to build as the demands for lower production costs, increased profitability and shorter production times are constantly increasing. High accuracy in measurements and well-balanced tolerances is required to achieve this. The fact that the concrete-elements doesn?t fit and that damage occurs during assembly is a highly topical issue even though we now have methods and systems that make this high-intensity construction possible. Through this report we want to highlight the problems that cause the dimensional and tolerance problems and give suggestions on how to come to terms with these.

Utvärdering av ett optimeringsprogram för produktionsplanering.

The aim of this thesis is benchmarking of the program, based on dynamic programming, that earlier was written to imitate the production planning at TSS.This thesis starts with a chapter about the construction of the DP-program, a shorter description of one and each of the program parts and also a list over the in- and output data in each program part. The DP-program consists of six linked MATLAB-files that together produce an optimized production plan for the different planning groups at TSS. The program reads in and reformat the given data and optimize the production of the articles in one group. Finally it compounds all article production plans and give us a production alternative.After running the program with new data the result shows, resembling with previous results, that TSS could be able to make some distinct cost-savings. According to the program, a 50 % decrease of TSS production costs is possible. .

Utveckling av en ny tillverkningslina

This report contains results of our study at CTC in Ljungby. CTC produces heating products such as boilers, heat pumps and additional products to their heating systems.The purpose of the report is to make a proposal how CTC will supply their new production line for heat pumps with materials. The proposal includes a production layout and a scheme for how to place the material in the production storage.The new production line will produce two different products and both of them have several variants. The line will also have a mixed flow, so the products can be produced in a random order. These conditions demand that the production line has great flexibility and that the material to all the variants can be stored in the production storage.With these conditions as input we made a layout proposal to the company.

Tjäna pengar som gräs? :

The producers of grain in Sweden are facing a rough future. The competition is getting harder all the time, in Sweden, in EU and also from the ?world market?. The producers have to be more efficient and have to have bigger units. Many producers might have to look for new alternative production opportunities.

Tumult i Texas - ett undersökande arbete om bildspråk och berättande

Thick skin in Texas - an investigation on storytelling and pictorial language. I took my starting point in a story about the cowboy Jaquin, who goes to the Tivoli, where he gets caught up in a dramatic adventure. I extracted three scenes from this story, and I experimented with whether it was possible to make the separate scenes tell their own story, in three separate drawings. Without depending on the frame story or on any kind of text. In this project I partly wanted to explore the possibilities of the drawing.

Den brasilianska nötköttsproduktionens framtida utveckling :

To value the risk and opportunity for our production in Sweden it is necessary to understand the marketing development for beef cattle production in the world. We have chosen to look at the Brazil beef cattle production. They are one of the biggest producers, have good opportunity to develop further and have a big affect at the world market. The method of our work is to gather information from experts of beef cattle production, located in Brazil. We have also gathered information through studies of literature. The factors that will have a big influence at the Brazil beef cattle production during the upcoming years is more efficient land use, lower age of slaughtering and extended use of feedlot-system. Our conclusion is that the Brazil beef cattle will have a sharp increase during the next five years. The amount of pasture will not change during that time.

Integrering av pelletsfabrik med Rya kraftvärmeverk i Göteborg : en teknisk och ekonomisk utredning

Göteborg Energi has a surplus of district heating during spring, summer and fall. The heat surplus is due to a constant production of waste heat from oil refineries and heat from waste incineration over the year. It would be desirable to increase the demand for heat and the uptime for the newly built combined heat and power generation plant, Rya Kraftvärmeverk. One alternative could be to integrate Rya Kraftvärmeverk with a pellet production facility. By producing heat, electricity and pellet in a joint process the energy use can be decreased.

Varför BIM?

Is the new technology always the best? This final project tries to determine if BIM is the melody of today, or if traditional 2D drawing is recommended. Perhaps a compromise is necessary, utilizing both methods.In order to answer this question, different views from the industry have been retrieved through reports, producers of software and users. The approach has consisted in building a 3D model of the school Råslättsskolan, house 01, along with interviews with people involved in the building process.When working in 2D it is hard to include the third dimension, mistakes are done and collisions happen that must be corrected, in most cases at the construction site. BIM is an incredible help since the model allows you to detect collisions and correct them.

Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company

A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it?s possible to produce the publications that Villafabriken demands from the designengineer?s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn?t only mean a new way of drawing, it also require a change in the company?s process were the information from the model is being used..

1 Nästa sida ->